Public Utilities Development Fees

ELECTRICITY

Connection Fee:

a) Base connection fee
In case of connection to the low voltage / 0, 4 kV-more than 32 A /supply network:
In case of direct connection to mid/low voltage (20kV/0,4kV)supply point:
In case of connection to the mid voltage (20kV) supply network:
- In case of direct connection to high/mid voltage (120 kV/20/kV) or mid/mid voltage supply point in the power substation for mid-voltagesupply:
b) Construction costs of connecting cables are additional to the base connection fee:
Overhead cable: over length of 30 m max.:
Underground cable: over length 15 m max.:
c) Construction costs of public cables are additional to the base connection fee:
Low voltage overhead cable: Low voltage underground cable:
Mid voltage overhead cable: Mid voltage underground cable:

WATER

Infrastructure development contribution (connection fee):
Firewater (availability):

SEWAGE

Infrastructure development contribution (connection fee):

NATURAL GAS

Infrastructure development contribution
(connection fee), as agreed:
x contracted consumption
gas quantity (Nm3/h)